Repairing, maintaining 41MW Steam turbine
Repair - Maintenance and alignment of 41MW Steam Turbine:
- Disassemble, clean, repair and maintain Turbine parts.
- Replace parts: bearing bearings, seals...
- Align and reinstall parts.
Other Projects
Overhaul of Residual Heat Boiler No. 1
Online leak sealing at flange of safety valve 30-PSV-1013
Manpower supply for General maintenance TA2020
Online leak sealing of water supply line to boiler A
Clean and replace catalysis blocks