Repair/Overcome the vibration of Turbine Unit 1

Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.

  • Adjust parameters of journal bearing 3,4.
  • Repairing pillow pedestals number 3, 4.
Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine turning-device - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Other Projects

Turbine Overhaul ST01101 - Gas Generation Plant

Turbine Overhaul ST01101 - Gas Generation Plant

View more
Aluminum blasting 600MW turbine

Aluminum blasting 600MW turbine

View more
Overhaul of Residual Heat Boiler No. 1

Overhaul of Residual Heat Boiler No. 1

View more
Provide cold cutting service for 24" pipes

Provide cold cutting service for 24" pipes

View more
Manpower supply for Commissioning - Startup

Manpower supply for Commissioning - Startup

View more
Supply of equipment, piping flange re-surfacing services

Supply of equipment, piping flange re-surfacing services

View more