Overhaul of Residual Heat Boiler No. 1
Thay thế các dàn ống Bộ quá nhiệt, Bộ tiết kiệm than.
Other Projects
Supplying materials, equipment and manpower to repair Expansion Joint CCR
Repair and replace the roller bearings supporting the drying drum
Providing pipe, equipment flange bolting services
Installing bucket elevator, fans - Line 3
Air dryer repair Unit 1,2