Online leak repair for of reduce temperature line Furnace 1

  • Survey, calculate data, design, process and manufacture Clamp.
  • Install clamp, glue injection for online leak sealing of reduce temperature line.

Pipe line parameters:

- Pressure: 100 bar.

- Temperature: 200 degrees Celsius.

Online leak repair for of reduce temperature line Furnace 1

Leak point before repair - An Khanh Thermal Power Plant

Online leak repair for of reduce temperature line Furnace 1

The leak point was completely sealed after repairing - An Khanh Thermal Power Plant

Other Projects

Dynamic balancing for pump impeller 045-P-101A/B/C/D

Dynamic balancing for pump impeller 045-P-101A/B/C/D

View more
Repair and replace the roller bearings supporting the drying drum

Repair and replace the roller bearings supporting the drying drum

View more
Manpower, equipment supplying to perform painting and sandblasting services

Manpower, equipment supplying to perform painting and sandblasting services

Scaffolding rental for construction - HTTC

Scaffolding rental for construction - HTTC

View more
Air dryer repair Unit 1,2

Air dryer repair Unit 1,2

View more
Overhaul for Fuel Supply Pump System Flowserve PU201-203

Overhaul for Fuel Supply Pump System Flowserve PU201-203

View more