Online leak repair for of reduce temperature line Furnace 1

  • Survey, calculate data, design, process and manufacture Clamp.
  • Install clamp, glue injection for online leak sealing of reduce temperature line.

Pipe line parameters:

- Pressure: 100 bar.

- Temperature: 200 degrees Celsius.

Online leak repair for of reduce temperature line Furnace 1

Leak point before repair - An Khanh Thermal Power Plant

Online leak repair for of reduce temperature line Furnace 1

The leak point was completely sealed after repairing - An Khanh Thermal Power Plant

Other Projects

Online leak sealing for 2" pipeline welds

Online leak sealing for 2" pipeline welds

View more
Repair and maintenance of Feed pumps, fans

Repair and maintenance of Feed pumps, fans

View more
Fabrication, installing water supply pipes across Vam Co Dong river

Fabrication, installing water supply pipes across Vam Co Dong river

View more
Maintenance , overhaul turbine, generator and auxiliary equipment Unit 2

Maintenance , overhaul turbine, generator and auxiliary equipment Unit 2

View more
Heat exchanger flanges re-surfacing

Heat exchanger flanges re-surfacing

View more
Manpower supply for General maintenance TA2020

Manpower supply for General maintenance TA2020

View more